Draft Electric Resource Plan 2009-2018
On January 31, 2008, Long Island Power Authority (LIPA) President and CEO Kevin S. Law kicked off the development of the 2009-2018 LIPA Resource Plan.
This page provides a record of the first four steps of
the process.
Now available: Electric Resource Plan 2010-2020
LIPA is using the following process to develop the plan:
- Publish a draft outline of the Resource Plan contents.
- Solicit public input on the draft outline.
- Develop a Draft Resource Plan based on the outline and the public input received.
- Hold public hearings on the Draft Resource Plan.
- Revise the plan based on the public hearings and new information that may become available after the preparation of the Draft. Issue a Final Resource Plan for the consideration by the LIPA Board of Trustees.
Draft Electric Resource Plan Documents
To view PDF files you must have Adobe Acrobat Reader. Download now
Draft Electric Resource Plan 2009-2018 (PDF)
- Master Table of Contents (PDF)
- Preliminary Appendix A, Technical Report (PDF)
- Appendix B, Energy Primer (PDF)
- Appendix C, Response to Comments (PDF)
-
Appendix D, Technical Appendices
(PDF)
- D-1 Energy Plan 2004-2013 Status Report (PDF)
- D-2 Energy Plan 2004-2013 Follow-up Studies & Reports
- D-3 LIPA and Other Energy Related Web Links (PDF)
- D-4 Long Range Forecast of Energy Requirements (PDF)
- D-5 Energy Planning Process (PDF)
- D-6 Transmission & Distribution Planning Criteria and Guidelines (PDF)
LIPA Draft Electric Resource Plan Public Hearing Schedule
The purpose of the meetings is to receive comments on the recommendations contained in the Draft Electric Resource Plan. All interested persons are invited to attend a public meeting at which time a summary of the draft report will be provided and comments about the draft report will be heard.
- Thursday, April 2, 2009 - 10:00AM
William H. Rogers Legislature Building
725 Veterans Memorial Highway
Smithtown, NY
Hearing Transcript (PDF) | Presentation (PDF) - Monday, April 6, 2009 - 11:00AM
Nassau County Legislative Chamber
1550 Franklin Avenue
Mineola, NY
Hearing Transcript (PDF) | Presentation (PDF) - Tuesday, April 7, 2009 - 7:00PM
Melville Marriott
1350 Old Walt Whitman Road
Melville, NY
Hearing Transcript (PDF) | Presentation (PDF)
Draft Electric Resource Plan Technical Workshop
The purpose of the Technical Workshop was to provide an overview of how LIPA prepared the plan, the contents of the plan and guide users of the plan on how to read and interpret the content of the plan. The workshop was not a formal hearing, no transcripts were taken and the discussion of the workshop is not part of the public record of the Draft Electric Resource Plan. The response to comments in the final plan will not contain a summary and response of the discussion that occurred in the workshop.
-
Monday, June 15, 2009
LIPA Offices
333 Earle Ovington Blvd.
Uniondale, NY
Additional Material
- 2009-2018 Plan Development Process
- LIPA Energy Plan 2004-2013
- Local Transmission Owner Planning Process
Press Releases
- LIPA Releases Draft Energy Master Plan; Public Hearings in Nassau and Suffolk to take Place in April - March 24, 2009
- Draft Energy Master Plan Outline Released - January 31, 2008