Draft Electric Resource Plan 2009-2018

On January 31, 2008, Long Island Power Authority (LIPA) President and CEO Kevin S. Law kicked off the development of the 2009-2018 LIPA Resource Plan.

Process

This page provides a record of the first four steps of the process.
Now available: Electric Resource Plan 2010-2020

LIPA is using the following process to develop the plan:

  • Publish a draft outline of the Resource Plan contents.
  • Solicit public input on the draft outline.
  • Develop a Draft Resource Plan based on the outline and the public input received.
  • Hold public hearings on the Draft Resource Plan.
  • Revise the plan based on the public hearings and new information that may become available after the preparation of the Draft. Issue a Final Resource Plan for the consideration by the LIPA Board of Trustees.

BACK TO TOP

Draft Electric Resource Plan Documents

To view PDF files you must have Adobe Acrobat Reader. Download now

Draft Electric Resource Plan 2009-2018 (PDF)

BACK TO TOP

LIPA Draft Electric Resource Plan Public Hearing Schedule

The purpose of the meetings is to receive comments on the recommendations contained in the Draft Electric Resource Plan. All interested persons are invited to attend a public meeting at which time a summary of the draft report will be provided and comments about the draft report will be heard.

BACK TO TOP

Draft Electric Resource Plan Technical Workshop

The purpose of the Technical Workshop was to provide an overview of how LIPA prepared the plan, the contents of the plan and guide users of the plan on how to read and interpret the content of the plan. The workshop was not a formal hearing, no transcripts were taken and the discussion of the workshop is not part of the public record of the Draft Electric Resource Plan. The response to comments in the final plan will not contain a summary and response of the discussion that occurred in the workshop.