Reports & Studies
Browse through the Long Island Power Authority's various reports &
studies. To view many of the documents below, you will need
Adobe Acrobat Reader. You can download Acrobat Reader for free from Adobe.
Download now
Draft Electric
Resource Plan: 2009-2018
On January 31, 2008, Long Island Power Authority (LIPA) President and CEO
Kevin S. Law kicked off the development of the 2009-2018 LIPA Resource Plan.
Broadwater LNG: A Technical Assessment
On July 31, 2007, LIPA released a report by Levitan &
Associates, Inc. regarding the proposed Broadwater LNG Terminal.
Electric Utility Undergrounding Policies and Practices![]()
According to a new study, it would cost approximately $33.3
billion to underground LIPA's overhead Transmission and
Distribution (T&D) System, and overall system reliability
would not significantly improve.
FTI Consulting: LIPA's Strategic Organizational Review![]()
The purpose of the review was to decide
whether the Authority, as currently organized and
governed, was in the best position to
provide Long Island with reliable power
at the lowest cost over the long-term.
Liberty Consulting Report - Fuel & Purchased Power Cost
Adjustment Evaluation![]()
On September 23, 2009, Liberty Consulting issued their final
report with respect to their independent evaluation of LIPA’s
Fuel and Purchased Power Cost Adjustment.
LIPA Voluntarily Files Petitions with PSC
LIPA has voluntarily filed with New York
State’s Public Service Commission (PSC)
two petitions seeking PSC review of
LIPA’s fuel surcharge.
Local Transmission Owner Planning Process
As required by the New York ISO Comprehensive System Planning
Process, LIPA provide details of its long term transmission
plans including criteria, models, and local area development
Shoreham Site Evaluation Potential for Additional Generation
Report![]()
The objective of the study was to site the maximum amount of
combined cycle generating capacity within two different parcels
of land, designated as “Parcel A” and “Parcel B”.
